Schedule
What each service
Each row opens the full scope of that service: what is included, how long it takes and what you receive.
One record
Each service feeds
The four services describe the same vessel from different sides, so the work done in one is reused by the others.
Documentation is the foundation.
Manuals, drawings and certificates filed against their components are what a PMS is built on.
The PMS puts it to work.
Components, maintenance plans and documents in one system the crew uses every day.
Consultancy picks the system.
Comparing the providers against your vessel and crew means the record lands in a system that suits them.
360° shows what the drawings cannot.
Pictures taken with the panels open record what runs behind them, located on the same vessel.
How we work
From bare hull to a
-
01 · Audit
What exists
We start with the vessel, the documents and whatever system is already in place, and list what is missing, out of date or wrong.
-
02 · Structure
How the boat is run
A component hierarchy and a documentation tree built around how this vessel is actually operated.
-
03 · Populate
Everything filed
Manuals, drawings and certificates collected, renamed and filed against the component they belong to. Maintenance plans built to manufacturer intervals, with LSA and FFE tasks alongside. You follow the progress in real time on a shared project platform.
-
04 · Handover
Crew trained, record verified
Quality checks on the database, the documentation and the maintenance plan, then training for Heads of Department and crew. An operational yacht takes about eight weeks. A new build is ready the day she is handed over, given six months' notice.
Record feed
Every entry lands against the component it belongs to.
An example of the filing log on a 62 m motor yacht during the populate stage.
- 14:02:11FILEDWatermaker service manual → 5.3.2 Fresh water
- 14:02:09LINKEDType approval certificate → 2.1.1 Main engine PS
- 14:02:04PLAN500 h interval → 7.4 Stabiliser actuator
- 14:01:58360°Engine room, frame 34 → 118 pictures
- 14:01:51RENAMEDMTU_16V4000_OM_r3.pdf → Operating manual, rev. 3
- 14:01:44VERIFIEDNameplate checked on board → Generator 2
- 14:01:37FILEDFire detection drawing → 9.1 Safety
Tell us about your
New build or mid-refit, tell us where your data stands today. No commitment, just a conversation.